The Egina development project, located offshore at the OML 130 block, involved the connection of 29 wells and the installation of 52 km of pipeline, at depths reaching 2,500 meters.
The field was designed to tie back to a new FPSO, with a focus on managing high-pressure production, gas lift, and water injection systems.
As part of the USAN deepwater development, the client required the connection of 34 subsea wells and the installation of 65 kilometers of pipeline.
The project involved complex subsea infrastructure, requiring a reliable configuration to manage flow distribution and field production.
Temneft contributed to the design of System R, including: