For the Bonga NW field extension, the scope included 38 km of subsea pipelines and connection of 8 wells.
The project required:
● FTAs (Flowline Termination Assemblies)
● Umbilical reels
● Flowlines
Contribution:Temneft provided detailed engineering support for subsea architecture, layout definition, and transportation logistics.
The work included interface management, mechanical design, and load analysis for offshore handling and installation.